Preventative Maintenance

Commercial Sealcoating in Utah

Sealcoating is the cheapest way to extend the life of a commercial lot. It is also the easiest thing to put off. Apex Asphalt seals parking lots, private roads and access lanes across five Utah counties.

Why work with Apex Asphalt

Licensed & Insured

Fully licensed and insured. So commercial, HOA, municipal and government contracts are all covered.

No-Obligation Quotes

Scope and price in writing first. Therefore you can decide without any pressure.

Work Around Your Hours

Phased, overnight and weekend crews. As a result your lot keeps operating.

Built for Utah Weather

Materials chosen for freeze-thaw and high-desert sun, because generic specs fail here.

What Sealcoating Actually Does

Asphalt is held together by binder. That is the black, tar-like glue holding the aggregate in one mat. Sunlight breaks it down. So the surface fades from black to grey, then goes brittle and porous.

Once porous, it drinks water. In Utah that water then freezes, expands, and tears the mat apart from inside. Meanwhile fuel and oil drips dissolve unprotected asphalt on contact.

Sealcoating puts a barrier over that binder. UV gets blocked. Water sheds instead of soaking in. The drips wipe off rather than eating down. However, it is not structural. A failing base stays failing, and a real crack stays open. So anyone selling it as a repair is misleading you.

What it does do is slow the clock on a sound surface, for a small fraction of resurfacing cost. That is the whole value.

UV Protection

Blocks the sunlight that oxidises binder. Without it, a flexible surface turns grey and brittle.

Water Barrier

Keeps water out of the mat. Therefore it cannot freeze inside and break the surface apart.

Fuel Resistance

Guards against petrol, oil and hydraulic drips. Otherwise those dissolve asphalt on contact.

Looks Maintained

Returns a deep black finish. As a result striping pops, and the property reads as cared for.

Further reading: For material and mix background, see the Asphalt Pavement Alliance.

Sealcoating in Progress

Close-up of sealcoat being squeegeed across asphalt

Sealer squeegeed to an even coverage rate.

Two Apex Asphalt crew members applying sealcoat to a parking lot

Two-man crew working a commercial lot.

Apex Asphalt crew spray-applying sealcoat to a commercial lot

Spray application across open areas.

How We Approach Sealcoating

Surface Cleaning

We sweep and blow the whole surface first. Sealer will not bond to dirt, and skipping this is why cheap coats peel.

Oil Spot Priming

Stained areas get degreased and primed. Otherwise the sealer lifts off those patches in sheets.

Cracks First

Cracks get sealed before any coat goes down, because sealer alone cannot fill them. See crack sealing.

Edge Detail

Clean lines cut by hand along curbs, islands and building edges before the open areas.

Measured Coverage

Too thin fails early, and too thick cracks. So coverage rate is measured rather than guessed.

Phased Reopening

Sections stay closed until cured, then reopen. Meanwhile we handle barricades and signage.

Service Area

Where Apex Asphalt Works

Our crews cover five Utah counties. That spans the Wasatch Front, plus the Tooele and Heber valleys. So pick your county below for local detail. Otherwise, call us and we will confirm coverage for your address.

Salt Lake County

The whole valley. So Salt Lake City, Sandy, West Jordan, Murray and Draper.

Utah County

Provo and Orem, plus Lehi, American Fork, Spanish Fork and Payson.

Davis County

Layton and Bountiful, and also Kaysville, Farmington and Clearfield.

Tooele County

Tooele and Grantsville, then Stansbury Park and Erda as well.

Wasatch County

Heber City and Midway, since the Jordanelle corridor is covered too.

FAQ

Common Questions

Every two to three years for most Utah properties. Heavy traffic or full sun pushes that toward two. Shaded, lightly used areas can stretch to four. However, sealing more often than every two years is usually wasted money, because the coat has not worn through yet.

Around 24 hours per section in good drying weather, longer when it is cool or humid. Because we phase the work, most properties never lose the whole lot at once. You get a specific reopen time on the day.

No, and be wary of anyone who claims otherwise. Sealcoat is a thin film, not a filler. Cracks need sealing first, and potholes need cutting out. Sealing over damage simply hides it while it worsens underneath.

On a sound lot, it is the best maintenance money you can spend. Resurfacing is a major capital cost. A seal cycle costs a fraction of that, and it can push resurfacing out by years.

Yes. That is how we run nearly every commercial job, either a few rows at a time or overnight.

No Obligation

Get Your No-Obligation Quote

Tell us about the property. Then we come and walk it, and you get a written quote. There is no obligation afterwards. Alternatively, call (801) 669-9024 and reach a real person.

Phone: (801) 669-9024
Email: [email protected]
Hours: Mon–Fri, 9:00 AM – 5:00 PM