Surface Restoration

Parking Lot Resurfacing and Overlay

Parking lot resurfacing sits between patching and a full rebuild. When a surface is spent but the base below it still holds, an overlay restores the whole lot for a fraction of reconstruction cost.

Why work with Apex Asphalt

Licensed & Insured

Fully licensed and insured. So commercial, HOA, municipal and government contracts are all covered.

No-Obligation Quotes

Scope and price in writing first. Therefore you can decide without any pressure.

Work Around Your Hours

Phased, overnight and weekend crews. As a result your lot keeps operating.

Built for Utah Weather

Materials chosen for freeze-thaw and high-desert sun, because generic specs fail here.

When Parking Lot Resurfacing Makes Sense

There is a point where patching stops being worth it. The surface is oxidised through. Cracking is everywhere. Each repair sits surrounded by asphalt that will fail next season.

But if the base below is still sound, you do not need a full rebuild. On a lot that was built properly, the base very often is fine.

So resurfacing takes the failed top layer off and lays a new one over the existing structure. Milling removes the old surface first, which keeps the finished height correct against curbs, gutters, drains and door thresholds. Then the new lift goes down over a tacked surface and gets compacted to density. The result looks and performs like new, without the cost and downtime of excavating the whole section.

One honest caveat, though. If the base has failed, an overlay buys a year or two before the same cracks telegraph through. Therefore we assess before we recommend it, and we will tell you when the base is not up to the job.

Base Checked First

We verify the structure underneath before recommending anything. Otherwise an overlay is money thrown away.

Milled to Grade

Removing the old lift keeps heights right at curbs, drains and doorways. So no trip edges appear.

Tacked and Bonded

Tack coat between old and new. As a result the lift bonds into one system instead of sliding.

Phased Scheduling

Section by section, overnight or weekends. Therefore the property keeps running throughout.

Further reading: Overlay design and thickness guidance comes from the Asphalt Pavement Alliance.

Resurfacing Results

Aerial view of a freshly sealcoated and striped commercial parking lot

A resurfaced commercial lot from the air.

Completed commercial parking lot with fresh sealcoat and striping

Sealed, striped, and back in service.

Crisp white stall striping on a freshly sealcoated parking lot

New surface holding crisp line work.

Parking Lot Resurfacing Options

Mill and Overlay

Milling the failed layer, then placing a new lift. This is the standard approach where the base is sound.

Overlay Only

Where height allows and the surface is stable, a lift can go straight over at lower cost.

Partial Areas

Sometimes only the drive aisles or dock zones are worn. So we treat those rather than the whole lot.

Rebuild Zones

Sections where the base genuinely failed get rebuilt, then integrated with the overlay around them.

Drainage Correction

Ponding areas get regraded during the work, because a new surface must actually shed water.

Restriping After

Fresh layout goes down once the surface cures. See striping.

Service Area

Where Apex Asphalt Works

Our crews cover five Utah counties. That spans the Wasatch Front, plus the Tooele and Heber valleys. So pick your county below for local detail. Otherwise, call us and we will confirm coverage for your address.

Salt Lake County

The whole valley. So Salt Lake City, Sandy, West Jordan, Murray and Draper.

Utah County

Provo and Orem, plus Lehi, American Fork, Spanish Fork and Payson.

Davis County

Layton and Bountiful, and also Kaysville, Farmington and Clearfield.

Tooele County

Tooele and Grantsville, then Stansbury Park and Erda as well.

Wasatch County

Heber City and Midway, since the Jordanelle corridor is covered too.

FAQ

Common Questions

Three signs point to base failure: widespread interconnected cracking, areas that flex under a loaded vehicle, and rutting that returns after repair. By contrast, isolated surface cracking on a lot that feels solid usually means the base is fine. We assess rather than guess.

That depends on size and phasing. A mid-size retail lot done in sections can run several days. Larger phased jobs take longer, precisely because we keep you open. You get a schedule with the quote.

Usually 24 to 48 hours for cars, depending on temperature and lift thickness. Loaded trucks should wait a little longer. Meanwhile we mark cured and uncured sections clearly.

Late spring through early autumn. Asphalt needs enough ambient and ground heat to compact properly. So we schedule this work roughly April to October, and the good slots fill early.

It can, and this is the right moment to address them. Regrading during resurfacing costs far less than correcting it later. Besides, standing water is the fastest way to ruin a brand new surface.

No Obligation

Get Your No-Obligation Quote

Tell us about the property. Then we come and walk it, and you get a written quote. There is no obligation afterwards. Alternatively, call (801) 669-9024 and reach a real person.

Phone: (801) 669-9024
Email: [email protected]
Hours: Mon–Fri, 9:00 AM – 5:00 PM